225
House
Rooms
Build
Journal
Sign in
Menu
Journal
03 entries
Notes from
the build.
Short entries, in order. What was drawn, what was dug, what changed.
20 Sept 2026
Eight rooms, in colour
Eight rooms, in colour
The first interior studies. Cream, sage and forest green.
08 Sept 2026
Breaking ground
Breaking ground
Excavation starts. The basement is a hole for now.
18 Aug 2026
Sealed
Sealed
Eighteen sheets, one stamp. The drawings are final.
04 — Build
Follow the schedule →